May 21, 2019

Posted by Communications Dept. on 5/21/2019

Casework being installed Installation of the large exterior store front windows began last week. Exterior windows and siding installation continues. The new boilers, pumps, and associated piping have been installed.

 

The main electrical switch gear is nearing completion, with PUD scheduled to bring power to the building by the end of the month.

 

Finish work is underway throughout the classroom wing, including casework, ceiling tile, wall coverings, white boards, painting, and interior glazing.