February 14, 2020

Posted by Communications on 2/14/2020

The roof on the new building is dried-in.  Mechanical and electrical rough-in work continues below.  For Building A, the sub-floor was poured and looks great.  The existing roofing has been torn off and it is dried-in, including the A/B connector.  Windows are in and interior finishes are beginning.