- Everett Public Schools
- Maintenance
Capital Projects
Page Navigation
2016 Bond and Capital Levy Maintenance Projects
-
Athletics Building HVAC upgrades (completed)
This project includes upgrading the HVAC equipment and control system at the Athletics building, as well as installation of a fire alarm system.
-
Everett High exterior finish restoration (completed)
This project will include cleaning, sealing, caulking, and repointing of the existing exterior masonry and terra cotta, in order to preserve and enhance the historical façade of the building.
-
Everett High Main Building mechanical upgrades (completed)
The project included replacing two existing roof top air handling units.
-
Everett HS Lincoln Field synthetic turf replacement (completed)
The new synthetic turf surface is finished, new backstop netting installed and students are enjoying the field! This project included replacement of the existing synthetic turf surface with new synthetic turf. The old surface was worn out due to wear and deterioration, and in need of replacement. The original field was installed in 2004.
-
Gateway Middle School roof replacement (completed)
The roofing project included the removal of the existing roofing on all buildings; and installation of new composition shingles, flashing, sheet metal and gutters.
-
HVAC upgrades at 8 sites (completed)
The scope of work includes replacement of mechanical units and control systems, cooling tower replacement and boiler replacement at eight sites. Duct work replacement is not included.