2016 Bond and Capital Levy Maintenance Projects

  • Everett High exterior finish restoration

    This project will include cleaning, sealing, caulking, and repointing of the existing exterior masonry and terra cotta, in order to preserve and enhance the historical façade of the building.

    Comments (-1)
  • Everett High Main Building re-roof and mechanical upgrades

    This project includes replacing the existing roof and insulation with a new single ply roof.

    Comments (-1)
  • Everett HS Lincoln Field Synthetic Turf Replacement

    This project includes replacement of the existing synthetic turf surface with new synthetic turf surface. The old surface is worn out due to wear and deterioration, and is in need of replacement. The original field was installed in 2004.

    Comments (-1)
  • Gateway Middle School roof replacement

    The roofing project includes removal of the existing roofing on all buildings; and installation of new composition shingles, flashing, sheet metal and gutters on sloped-roof buildings; and installation of new PVC membrane roofing, flashing, sheet metal and gutters on flat-roofed buildings.

    Comments (-1)
  • HVAC technology infrastructures

    Work includes upgrades to the district’s wireless infrastructure to support increased wireless connectivity, upgrades to the cooling systems in the rooms that house data equipment, and installation of electrical circuits that are powered by the backup generators.

    Comments (-1)
  • HVAC upgrades at 8 sites

    The scope of work includes replacement of mechanical units and control systems, cooling tower replacement and boiler replacement at the following schools. Duct work replacement is not included.

    Comments (-1)